Tuesday, July 12, 2016

Hotel

How much does it cost to build the average hotel?

There are a huge number of variables in such a question. For one thing, will it have a restaurant? What about a banquet or conference facility? Does it need a swimming pool or a gym? Is there a large lobby lounge?
According to USAToday, the average hotel room is roughly 325 square feet with interior dimensions of approximately13'x25' (including a full bathroom). In the United States, the average hotel will have 115 rooms and require around48,000 square feet.
Interestingly enough, a survey conducted by "Luxury and Resort Travel" found that the top amenities in most hotels were those "en suite" or available in the room rather than on the grounds. Because of this, we will consider the construction of a hotel with "Mid Priced" rooms, a lobby lounge, and the facilities to administer 24-hour room service.
The building of hotel requires an architect or an architectural firm, a knowledgeable contractor, a team of subcontractors, and a cooperative developer/owner to get the job done in a reasonable time frame.
  • According to Hawkins Research, Inc., most hotel projects should use materials and techniques that fall under the "Best" classifications to keep wear and tear or replacement costs low. Such a building would run at an average of $22.2 million to complete. This does not include acquisition of the land or any demolition costs, however.
  • The above figures place this construction at a $463 per square foot cost, though a national average of stands between $325 and $450 for hotel contractors. This pricing structure assumes that the work is unionized. "Open shop" laborers would follow a price structure that includes - carpenters, masons and excavators charging an average of $70 per hour, electricians between $65 to $85 per hour, painters between $20 and $35 per hour and plumbers between$45 and $65 per hour.
  • Materials would cost around $9.8 million, labor would cost roughly $8.9 million, and the machine costs would stand at roughly $935,000.

Monday, July 11, 2016

Embodied Energy

https://en.wikipedia.org/wiki/Embodied_energy


Material Energy MJ per kg Carbon kg CO2 per kg Density kg /m3
Steel (general, av. recycled content)20.11.377800
Concrete (1:1.5:3)1.110.1592400

Thursday, February 11, 2016

Structural


Vanity Height: How Much of a Skyscraper is Usable Space?


Dubai’s Burj Khalifa, which is measured at 828m (2717ft)
The Burj Khalifa’s total vanity height is 244m (39%)which, on its own, would stand as Europe’s 11th tallest skyscraper. 
BURJ KHALIFA VANITY HEIGHT = 800 FT = 39%


Kingdom Tower height: 1000 plus metres (to surpass Burj Khalifa by at least 173 metres)
1,008 m (3,307 ft) 
-Highest occupiable floor: Level 163
167 (2 below ground) (252 including uninhabitable "floors" in the spire) [4]
KINGDOM TOWER VANITY HEIGHT = 89 FLOORS * 13.12 FT PER FLOOR = 1,168 FT = 35%

The global number of buildings taller than 200 metres has almost tripled since 2000, increasing from 263 to 756 at the end of 2012. In total, 35 buildings taller than 200 metres were completed in Asia in 2012 and 16 in the Middle East. On the contrary, six were completed in North America, including only two in the United States, which once dominated tall building development.

Of the projects under construction, 59 will join the list of the 100 tallest buildings in the world; eight will likely make the top 10. There are also 10 buildings taller than 500 metres under construction, including three mega-talls, over 600 metres.







Taller: How Future Skyscrapers Will Beat the Burj Khalifa


The Engineering Tricks Behind the World's Super Tall and Super Slender Skyscrapers

According to Bill Baker, the structural engineer for Skidmore, Owings & Merrill responsible for the Burj Khalifa, the trend towards taller, thinner buildings has presented new spins on old engineering challenges. When the ratio between the height and width of a building goes beyond 8 :1 or 9:1, it becomes increasingly more expensive to construct, since it requires thicker walls and more sophisticated technology to reduce the amount of swaying and shaking caused by the wind (Baker compared today's thinner supertalls to a fishing rod, and making one stand up straight requires much more reinforcement). The height-to-width ratio for 432 Park Avenue is 15:1; to put that in perspective, if you place a standard ruler on its end, it has a ratio of 12:1.



Michell Truss
http://www.grasshopper3d.com/forum/topics/parametric-mitchell-truss-geometry

http://www.grasshopper3d.com/forum/topics/curves-intersecting-a-surface


http://gizmodo.com/how-flowers-help-us-understand-why-bridges-collapse-1775500894


https://www.arraysolutions.com/Products/windloads.htm

Force, F = A x P x Cd
A = The projected area of the item
P , Wind pressure (Psf), = .00256 x V^2  (V= wind speed in Mph)
Cd , Drag coefficient,  = 2.0 for flat plates. For a long cylinder (like most antenna tubes), Cd = 1.2.
Note the relationship between them is 1.2/2 = .6, not quite 2/3.


https://books.google.com/books?id=aOHpAwAAQBAJ&pg=SA6-PA1&lpg=SA6-PA1&dq=design+prevailing+wind+lateral+load&source=bl&ots=UNtcYZHlsq&sig=dx896BdbNe69KqBsJvYnMHg-k7Y&hl=en&sa=X&ved=0ahUKEwj93t-Muu_KAhUFNiYKHTYPAwYQ6AEIJjAC#v=onepage&q=design%20prevailing%20wind%20lateral%20load&f=false



Friday, December 11, 2015

Energy Cost Analysis

http://science.howstuffworks.com/environmental/energy/sell-electricity-back-grid3.htm

In the U.S., the Public Utility Regulatory Policy Act (PURPA) dictates that electric utilities on the traditional power grid must purchase the excess electricity that renewable energy systems generate.

Net metering is a process by which a single, bidirectional meter spins forward to track the electricity a seller takes from the grid and backward to meter the excess energy they produce. If you've taken out more electricity than you've produced at the end of the month, you'll owe the power provider the retail rate for that excess. However, if you've put in more than you've drawn from the grid, the power provider will pay you the retail instead of the wholesale rate for that excess energy.

RECs are certificates issued by the government establishing ownership of renewable energy. One REC is issued for every 1,000 kilowatt-hours (kWh) of energy funneled back into the grid.



http://www.bayareacensus.ca.gov/counties/SanFranciscoCounty.htm

Total Households in SF 2010 = 345,811

http://www.bayareacensus.ca.gov/cities/Oakland.htm

Total Households in OAK 2010 = 153,791

TOTAL = 499,602

AVG US HOUSEHOLD = 957 kWh per month = 11.484 MW per year

499,602 HOUSEHOLDS TOTAL * 11.484 MW = 5,737.4 GW

EIA Data Browser

https://www.electricchoice.com/electricity-prices-by-state/

https://www.eia.gov/electricity/monthly/epm_table_grapher.cfm?t=epmt_5_6_a

12.73 cents per kWh average U.S.

17.36 cents per kWh average for state of California

1 GW = 1000 MW   1 MW = 1000 kW

1 MWh = $173.6 AVG.
1 MWh = $332.895 PEAK

1 GWh = $173,000 AVG.
1 GWh = $332,895 PEAK


TIER 1     18.2 cents per kWh     base * 1.1813     17.3600 cents
TIER 2     21.5 cents per kWh     base * 1.1813     20.5074 cents
TIER 3     27.4 cents per kWh     base * 1.5055     26.1355 cents
TIER 4     34.9 cents per kWh     base * 1.9176     33.2895 cents

Sunday, December 6, 2015

PAINT


Iridescence is an optical phenomenon of surfaces in which hue changes with the angle of observation and the angle of illumination.

https://en.wikipedia.org/wiki/Iridescence

THERMOCHROMIC PAINT PIGMENT will change color at 86 degrees F to reveal base coat.

https://kandypearls.com/shop-kustom-paint/temperature-changing-paint/


Orange Ghost Pearl  / Orange Interference Pearls
http://www.pearlsandpigments.com/Interference-Pearls/

https://www.paintwithpearl.com/shop/interference-iridescent-ghost-pearls-pigments/orange-ghost-pearl/


Pearl Pigments
http://www.kppigments.com/collections/interference-pearls

https://www.dipyourcar.com/collections/kp-pigments



INTERNATIONAL ORANGE

Bridge Sample: 16-88-97-5

http://goldengatebridge.org/research/factsGGBIntOrngColor.php

When purchasing paint for the Golden Gate Bridge, it is done through a competitive bidding process. Currently, the paint is supplied by Sherwin Williams and is made to match the Bridge International Orange color formula. The closest off-the-shelf paint color that Sherwin Williams has available is "Fireweed" (color code SW 6328).

Many people ask about the formula for the Bridge’s unique International Orange paint color. Paint stores can mix it with the following information:

CMYK colors are: C= Cyan: 0%, M =Magenta: 69%, Y =Yellow: 100%, K = Black: 6%.

The closest existing color codes to GGB International Orange color are:
PMS 173 (CYMK = 0%, 80%, 94%, 1%),
PMS 174 (CYMK 8%, 85%, 100%, 34%)
Pantone 180 (CYMK 19.4%, 77.9%, 79.6%, 3.6%) 

https://www.google.com/search?q=fireweed&espv=2&biw=858&bih=843&source=lnms&tbm=isch&sa=X&ved=0ahUKEwjB2arEg6TKAhUCqx4KHf_rDKIQ_AUIBigB#tbm=isch&q=golden+gate+international+orange

http://www.colorhexa.com/ff4f00

https://namedropping.wordpress.com/2012/10/07/the-golden-gate-and-the-international-orange-bridge/

http://www.danielsmith.com/content--id-108

Saturday, November 28, 2015

GEOTHERMAL

https://en.wikipedia.org/wiki/The_Geysers

For about 12,000 years, Native American tribes built steambaths at the Geysers and used the steam and hot water for healing purposes and cooking.

The Geysers is the world's largest geothermal field, containing a complex of 22 geothermal power plants, drawing steam from more than 350 wells, located in the Mayacamas Mountains approximately 72 miles (116 km) north of San Francisco, California.

The first geothermal wells drilled in Geyser Canyon were the first in the Western Hemisphere.[1] The first power plant at the Geysers was privately developed by the owner of The Geysers Resort[1] and opened in 1921, producing 250 kilowatts of energy to light the resort.[2] In 1960, Pacific Gas and Electric began operation of their 11-megawatt plant at the Geysers.[9] The original turbine lasted for more than 30 years and produced 11 MW net power.[10]

By 1999 the steam to power extraction had begun to deplete the Geysers steam field and production began to drop.[2] However, since October 16, 1997, the Geysers steam field has been recharged by injection of treated sewage effluent, producing approximately 77 megawatts of capacity in 2004.

In general, the Geysers has 1517 MW of active installed capacity/ 22 Plants
 In fact, The Geysers satisfies nearly 60 percent of the average electricity demand in the 
North Coast region from the Golden Gate Bridge to the Oregon border. 

1.517 GW / 22 = 68.9 MW
1.517 GW / 350 = 4.334 MW


https://en.wikipedia.org/wiki/Enhanced_geothermal_system
An enhanced geothermal system (EGS) generates geothermal electricity without the need for natural convective hydrothermal resources. Until recently, geothermal power systems have exploited only resources where naturally occurring heat, water, and rock permeability are sufficient to allow energy extraction.[1] However, by far most of geothermal energy within reach of conventional techniques is in dry and impermeable rock.[2] EGS technologies enhance and/or create geothermal resources in this hot dry rock (HDR) through 'hydraulic stimulation'.
When natural cracks and pores do not allow economic flow rates, the permeability can be enhanced by pumping high-pressure cold water down an injection well into the rock. The injection increases the fluid pressure in the naturally fractured rock, triggering shear events that enhance the system's permeability. As long as the injection pressure is maintained, a high matrix permeability is not required, nor are hydraulic fracturing proppants required to maintain the fractures in an open state. This process is termed hydro-shearing,[3] perhaps to differentiate it from hydraulic tensile fracturing, used in the oil and gas industry, which can create new fractures through the rock in addition to expanding the existing fractures.[4]
Water travels through fractures in the rock, capturing the rock's heat until forced out of a second borehole as very hot water. The water's heat is converted into electricity using either a steam turbine or a binary power plant system.[5] All of the water, now cooled, is injected back into the ground to heat up again in a closed loop.
EGS technologies, like hydrothermal, geothermal can function as baseload resources that produce power 24 hours a day, like a fossil fuel plant. Unlike hydrothermal, EGS may be feasible anywhere in the world, depending on the economic limits of drill depth. Good locations are over deep granite covered by a 3–5 kilometres (1.9–3.1 mi) layer of insulating sediments that slow heat loss.[6] EGS wells are expected to have a useful life of 20 to 30 years before the outflow temperature drops and the well becomes uneconomic.

http://c03.apogee.net/contentplayer/?coursetype=geo&utilityid=oge&id=6991

Energy calculations can be done using one of three basic methods:
  1. Degree-day procedure, which is the simplest but gives the poorest results.
  2. Bin method, which is relatively simple and accounts for the changing outdoor temperature and partial load conditions. This method is often used on single family residential applications.
  3. Hour-by-hour method using one of the many software programs available for these calculations. This method is often used for large commercial and institutional systems where considerable detail is required to make a good analysis.
Three key points are:
  1. The heating load should be calculated at the specified winter design outdoor temperature.
  2. The cooling load should be calculated at the specified summer design outdoor temperature.
  3. The assumption that neither heating nor cooling is required for a certain range of outdoor temperatures, typically from 62°F to 67°F.

GEOTHERMAL RESOURCES IN THE DIFFERENT REGIONS OF CANADAPotential geothermal applications in Canada


http://geo-energy.org/Basics.aspx

The USGS has defined moderate-temperature resources as those between 90°C and 150°C (194 to 302°F), and high-temperature geothermal systems as those greater than 150°C.  

In 1981 at a project in Imperial Valley, California, Ormat Technologies established the technical feasibility of the third conventional type of large-scale commercial geothermal power plant: binary.  The project was so successful that Ormat repaid its loan to the Department of Energy (DOE) within a year.   Binary geothermal plants have made it possible to produce electricity from geothermal resources lower than 302°F (150°C).  This has expanded the U.S. industry’s geographical footprint, especially in the last decade. 
Binary plants use an Organic Rankine Cycle system, which uses geothermal water to heat a second liquid that boils at a lower temperature than water, such as isobutane or pentafluoropropane. This is called a working fluid (or “motive fluid” in Figure 7).  A heat exchanger separates the water from the working fluid while transferring the heat energy.  When the working fluid vaporizes, the force of the expanding vapor, like steam, turns the turbines that power the generators.  The geothermal water is then reinjected in a closed loop, separating it from groundwater sources and lowering emission rates further (see section 5).  Most new geothermal plants under development in the U.S. are binary.

 http://www.mpoweruk.com/geothermal_energy.htm

United States Government energy agency estimates that the total energy available from global geothermal resources is approximately 15,000 times the energy contained in all the known oil and gas reserves in the world. ???

The U.S. has about 3 GW of geothermal electricity installed, out of the worldwide total of 10 GW. Surprising to me, Iceland has just 0.6 GW installed, but this is 30% of their national electricity production. Another surprise to me was that the Philippines also derive about 30% of their electricity from geothermal sources, amounting to 1.9 GW - See more at: http://physics.ucsd.edu/do-the-math/2012/01/warm-and-fuzzy-on-geothermal/#sthash.Vpd33DSD.dpuf